Upgrade / Electrical Work – 700 Sites (Delhi / NCR, UP West and Haryana)

  • Complete Electrical Works including Earthing.

IBS Works – 1500 Sites including 25 Metro Stations/Tunnels (Delhi/NCR)

  • Site Surveys, Planning  and designs
  • Installation, Commissioning and integration of the IBS sites, Walk Test and AT