New 2G/3G Rollout 70 sites (Roof top + Green field) 
 
Installation of Telecom Works:
 
  • Site Survey 
  • Installation of Antennas, Feeder Cables, Connectors and other GSM Ancillaries
  • Internal and External Works which include Installation and commissioning of Base stations, Antennas, Feeder Cables, Cable Trays, BTS, Rectifiers and Battery Banks
  • Equipment FSME, FRGF, FRGP, FSMD, ESME , Multi radio
  • Installation of Power Systems and Battery Banks
  • Integration of G900 / U900 / DCS1800 / U2100

U900 phase 1, 2, 3 250 sites (Roof top + Green field)
Telecom Works
 
  • Site Survey 
  • Swapping of single port antennas to multi port  Antennas
  • Internal and External Works which include Installation and commissioning of Base stations, Antennas, Feeder Cables, Cable Trays, BTS, Rectifiers and Battery Banks
  • Installation of Power Systems and Battery Banks
  • Combining the existing network to different solution to integrate U900
 
TRX downgrade 125 sites (Roof top + Green field)
 
  • Site Survey 
  • Downgrading the TRX configurations of GSM and DCS 
  • Reconfiguration and commissioning as per new RF data
 
LTE 800 and 2600 MHZ 55 sites (Roof top + Green field + Cow Sites)
 
  • Site Survey 
  • Swapping of antennas to multi port  Antennas
  • Internal and External Works which include Installation and commissioning of Base stations, Antennas, Feeder Cables, Cable Trays, BTS/Node B , eNode B, Rectifiers and Battery Banks
  • Installation of Power Systems and Battery Banks
  • Combining the existing network to different solution to integrate LTE 800 and 2600
  • PIM testing of new and existing jumper and feeder cables /connectors
Nokia Flexi packet MW project 95 sites (Green field and COW sites)
 
  • Site Survey 
  • Dismantling the existing antenna 
  • Hot swap and cold swap
  • Installation , commissioning and alignment 
  • Link configuration 1+0, XPIC, 1+1 SD
  • BER and Ethernet testing 
  • Traffic shifting 
 
Installation of Core Networks
 
  • Site Survey 
  • Installation and cabling of PCRF cabinets   3 sites 
  • Installation and cabling of NET Act server  3 sites
  • Installation and cabling of Traffica Server 5 sites 
  • Reshuffling of core networks 7 sites 
 
Nokia swap Project 230 sites (Green field, Roof top and COW sites)
 
  • Site Survey 
  • Swapping of Motorola and Alcatel lucent BTS to Nokia flexi 
  • Installation of Antennas, Feeder Cables, Connectors and other GSM Ancillaries.
  • Internal and External Works which include Installation and commissioning of Base stations, Antennas, Feeder Cables, Cable Trays, BTS, Rectifiers and Battery Banks.
  • Installation of Power Systems and Battery Banks
 
CW work Nokia –MOI 15 m special design Lattice tower supply and installation (Roof top)
 
  • Site Survey and design 
  • Supply and installation of 15 m special design lattice tower 
  • Complete installation of grounding system 
  • Supply and installation of cables trays 
  • Supply and installation of aviation light and climbing system 
  • Supply and installation of electrical system.