To measure a man's taste, watches are undoubtedly one of the replica watches uk best rulers. In addition to the wedding ring, watches may be the most acceptable accessories for men. Choose a replica omega delicate watch, for a successful man is understandable. In terms of the real love of the table, there is a close to the hublot replica totem worship of the kind of love, the man's stability, fortitude, punctuality, in the movement of time can rolex replica be reflected in the fine.
 
New 2G/3G Rollout 70 sites (Roof top + Green field) 
 
Installation of Telecom Works:
 
  • Site Survey 
  • Installation of Antennas, Feeder Cables, Connectors and other GSM Ancillaries
  • Internal and External Works which include Installation and commissioning of Base stations, Antennas, Feeder Cables, Cable Trays, BTS, Rectifiers and Battery Banks
  • Equipment FSME, FRGF, FRGP, FSMD, ESME , Multi radio
  • Installation of Power Systems and Battery Banks
  • Integration of G900 / U900 / DCS1800 / U2100

U900 phase 1, 2, 3 250 sites (Roof top + Green field)
Telecom Works
 
  • Site Survey 
  • Swapping of single port antennas to multi port  Antennas
  • Internal and External Works which include Installation and commissioning of Base stations, Antennas, Feeder Cables, Cable Trays, BTS, Rectifiers and Battery Banks
  • Installation of Power Systems and Battery Banks
  • Combining the existing network to different solution to integrate U900
 
TRX downgrade 125 sites (Roof top + Green field)
 
  • Site Survey 
  • Downgrading the TRX configurations of GSM and DCS 
  • Reconfiguration and commissioning as per new RF data
 
LTE 800 and 2600 MHZ 55 sites (Roof top + Green field + Cow Sites)
 
  • Site Survey 
  • Swapping of antennas to multi port  Antennas
  • Internal and External Works which include Installation and commissioning of Base stations, Antennas, Feeder Cables, Cable Trays, BTS/Node B , eNode B, Rectifiers and Battery Banks
  • Installation of Power Systems and Battery Banks
  • Combining the existing network to different solution to integrate LTE 800 and 2600
  • PIM testing of new and existing jumper and feeder cables /connectors
Nokia Flexi packet MW project 95 sites (Green field and COW sites)
 
  • Site Survey 
  • Dismantling the existing antenna 
  • Hot swap and cold swap
  • Installation , commissioning and alignment 
  • Link configuration 1+0, XPIC, 1+1 SD
  • BER and Ethernet testing 
  • Traffic shifting 
 
Installation of Core Networks
 
  • Site Survey 
  • Installation and cabling of PCRF cabinets   3 sites 
  • Installation and cabling of NET Act server  3 sites
  • Installation and cabling of Traffica Server 5 sites 
  • Reshuffling of core networks 7 sites 
 
Nokia swap Project 230 sites (Green field, Roof top and COW sites)
 
  • Site Survey 
  • Swapping of Motorola and Alcatel lucent BTS to Nokia flexi 
  • Installation of Antennas, Feeder Cables, Connectors and other GSM Ancillaries.
  • Internal and External Works which include Installation and commissioning of Base stations, Antennas, Feeder Cables, Cable Trays, BTS, Rectifiers and Battery Banks.
  • Installation of Power Systems and Battery Banks
 
CW work Nokia –MOI 15 m special design Lattice tower supply and installation (Roof top)
 
  • Site Survey and design 
  • Supply and installation of 15 m special design lattice tower 
  • Complete installation of grounding system 
  • Supply and installation of cables trays 
  • Supply and installation of aviation light and climbing system 
  • Supply and installation of electrical system.