To measure a man's taste, watches are undoubtedly one of the replica watches uk best rulers. In addition to the wedding ring, watches may be the most acceptable accessories for men. Choose a replica omega delicate watch, for a successful man is understandable. In terms of the real love of the table, there is a close to the hublot replica totem worship of the kind of love, the man's stability, fortitude, punctuality, in the movement of time can rolex replica be reflected in the fine.

 
Turnkey Infrastructure Work for 250 GSM Sites including 

Site Acquisition

  • Site Surveys
  • Negotiations with the Owners
  • Consultant Reports 
  • Site Documentations
 
Civil Works 
 
  • Supply and Installations Roof Top Towers Self supported 3 legged towers --165 Nos
  • Supply and Installation of Greenfield/Dessert Towers—30 M / 40 M / 50M -- 82 Nos
  • Equipment Containers: Fitted with Air conditioners, Fire Protection Systems, Electrical Power Systems and Lighting, Cable Trays and Earthing Systems -- 8 Nos
  • Supply and Installation of DGs, FT ,ATS etc   13 KVA and 27 KVA   --  250 Sets
  • Supply and Installation of Temporary Sites ( GRDS ) –30 M --  5 Nos.
  • Supply and Installation of OBTS Frames; Sunshade and all related Civil works --165 Sites
  • All Associated Civil Works
  • Supply on Rental Basis  40 m Spiders to NSN for 1 year -- 3 Nos
 
Telecom Works
 
  • Internal and External Works which include Installation and commissioning of Base stations antennas, Feeder Cables, Cable Trays, BTS, Rectifiers and Battery Banks--200 Sites
  • Installations commissioning and alignment of Microwave links-- 200 links
  • Site Design Documents.
 
Swap Project
 
  •  Swapping  Ericsson with  NSN  Equipments -- 40 sites  
 
Field Maintenance Services
 
Hayat Communication did first line maintenance of KOREK Network covering 130 Sites for initial 6 months including fuel Management.