To measure a man's taste, watches are undoubtedly one of the replica watches uk best rulers. In addition to the wedding ring, watches may be the most acceptable accessories for men. Choose a replica omega delicate watch, for a successful man is understandable. In terms of the real love of the table, there is a close to the hublot replica totem worship of the kind of love, the man's stability, fortitude, punctuality, in the movement of time can rolex replica be reflected in the fine.

3A/4A/5A/6A/V.O. 10 /V.O. 13/V.O. 15 Projects

  • Supplied and Installed Cable Trays, Antenna Frames, Antenna Mounts, Installed Antennas, Feeder Cables etc. Performed Swap Tests and submitted reports. --- 64 Sites.
  • Installed Underlay M-Cell 6 and Horizon BTS AC – 90 Sites. 
  • Installed In-Cells, M-Cell BTS DC Macro ----70 Sites.
  • Installed 80 Micro-Cells (M-cell Micro, City, Arena etc.) in various Complexes, Airport, and Hotels etc.  
  • Installed Macro Horizon 1800 on existing 900 DC ---- 165 Sites.
  • Installed Underlay 1800 Horizon on existing 900 Underlay – 60 Sites. 
  • Completed Dual Band Sites with Horizon 900 and Horizon 1800 Cabinets---90 Sites.
  • Sector addition implemented on Underlay Sites – 20 Sites.
  • Completed Dual Band Sites with Horizon 900 and Horizon 1800 Cabinets—108 Sites.
  • Provided services of engineers to Motorola for MTC .
  • Provided services of engineers to Motorola for Drive Test.
  • (Optimizations).
  • Installation of Horizon Macro-II Sites -15 Sites.
  • Upgrading of Existing BTS -900 from 3/3/3 to 4/4/4 sites -100 Sites.
  • Upgrading Existing 900 Sites to Dual Band Sites- 15 Sites.
  • Installation of H2M Dual Band Sites.( Internal and External)---120 Sites 
 
3G Deployment Project - 530 Sites

  • Site Surveys.
  • Installation of Node B.
  • Supply and Installation of Antenna Mounts.
  • Installation of Node B Antennas.
  • Installation of Feeders.
  • VSWR Tests.
 
Swap Project - 260 Sites

  • Site Surveys , Preparing Site Investigation Reports, Site Installation Documents and As-Built.
  • Relocating Motorola Node Equipment on temporary basis within the Sites.
  • Installation of Motorola Equipments on allocated place and test.
  • Site Acceptance