FTTX 1st and 2nd phase
 
  • Survey of Buildings, Villas, Business hub , manhole , Duct route , central offices 
  • FTTH / FTTB design and implementation 
  • Design of FTTX network ( cable route , Manhole , port allocation , ODF design )
  • OSP cable laying of 150 KM 
  • End to end OTDR fiber testing 
  • Splitter and closure installation including splicing
  • Block wiring for building business and residential 
  • ISP installation of OH / UG / B2H E-FAT solutions of around 7000 connections 
  • Migration from copper to Fiber of around 7000 connections.
  • FTTH / FTTB design and implementation 
 
IBS 4 (ongoing)
 
  • Survey the building and design the IBS using IBwave tool
  • Installation of feeders, connectors, cable tray and antennas
  • Perform VSWR check and optimization for the completed sites
  • Walk test